Skip to content

City West Cable Tunnel, Sydney

Ancon stainless steel brackets have been used to support the heavy duty cables along the full length of the City West Cable Tunnel in Sydney.

The cable tunnel was constructed by Thiess as part of EnergyAustralia's major upgrade of electricity infrastructure of Sydney. Measuring 1.7 kilometres long and 3.5 metres wide, the new tunnel carries transmission cabling across the city's central business district.

The maintenance-free life and proven integrity of stainless steel, combined with Ancon's fabrication expertise, means no costly remedial measures will be required for the life of the structure.

Ancon was selected to manufacture this high specification support system due to its proven track record of supplying volume orders of standardised components.

Special Fabrications

Ancon is an ASSDA accredited specialist fabricator and has a wealth of experience in working with a range of types and grades of stainless steel.

Sections & Flooring

In addition to the supply of structural fixings, Ancon is a leading supplier of stainless steel sections and flooring.

Latest News

Christmas Shutdown 2018

The Auckland and Christchurch offices will close at 12:00pm on Friday 21st December 2018 and re-open at 8:30am on Monday 7th January 2019.