Skip to content

North-South Bypass Tunnel - Suspension Systems

The CLEM7 Tunnel, known as the North-South Bypass Tunnel during construction, is a new toll road built under the Brisbane River. It comprises two 4.8 kilometre twin-lane tunnels which bypass the city's central business district, significantly reducing congestion.

In addition to being the longest road tunnel in the country, it is also the most advanced with many safety features. In the event of a fire or explosion, a high-tech ventilation system comprising 100 jet fans will rapidly extract smoke to a longitudinal duct high above the road deck.

Ancon designed and manufactured the stainless steel suspension system used to hold the immense concrete slabs which form the duct.

Each component of the system performs an essential structural function within a highly corrosive environment. The welded sections were subject to particularly demanding quality standards and each underwent an intense test and inspection programme prior to despatch to confirm its integrity.

Ancon also fabricated the 33,000 light gauge stainless steel posts used to support the architectural lining around the tunnel walls. A dedicated production cell produced 1,900 posts per week to meet a strict site schedule.

Special Fabrications

Ancon is an ASSDA accredited specialist fabricator and has a wealth of experience in working with a range of types and grades of stainless steel.

Latest News

Christmas Shutdown 2020

Our offices will close on 24th December 2020 and re-open on 11th January 2021.

Exciting Changes: We are Leviat. We are Ready.

From 9th November 2020, we will communicate with you as Leviat. Exciting changes have taken place in our business that enable us to provide you with an enhanced product and service offering, and strengthen our ability to meet your evolving needs in the future.