Melbourne Cricket Ground, Melbourne

Ancon supplied three sizes of shear connectors to the redevelopment of the Melbourne Cricket Ground in Australia. Better known now as the Melbourne MCG, this stadium was the main track and field venue for 2006 Commonwealth Games. This project necessitated the rebuilding of 55% of an existing sportsground.

Construction joints were positioned not only to disect the arc of the stadium and thereby accommodate the inevitable movement, but also to phase the development work. The pour sequence was devised to enable key sporting events to continue to take place at the stadium with a pre-agreed seating capacity.

The two-part installation process of Ancon DSD shear load connectors is quick and accurate; it can prove more cost-effective than the build of more complicated joint details, such as double columns or corbels.

Each connector is a two-part assembly comprising a sleeve and a dowel component. Simple nailing of the sleeve to the formwork ensures subsequent alignment with the dowel assembly: essential where effective movement is required. Drilling of either formwork or concrete is not required. Manufactured from stainless steel, it provides a high degree of corrosion resistance with no requirement for additional protection.

Shear Load Connectors

Concrete structures are designed with expansion and contraction joints to allow movement to take place.

Reinforcement Continuity Systems

Independent tests have verified the enhanced performance specifically offered by Ancon KSN Anchors when used in slab-to-wall moment connections.

Latest News

Christmas Shutdown 2020

Our offices will close on 24th December 2020 and re-open on 11th January 2021.

Exciting Changes: We are Leviat. We are Ready.

From 9th November 2020, we will communicate with you as Leviat. Exciting changes have taken place in our business that enable us to provide you with an enhanced product and service offering, and strengthen our ability to meet your evolving needs in the future.