Skip to content

EdjPro EPHIMini

Optimum solution for plain and step-joint precast panels

The EdjPro EPHIMini Edge Lifting System has been specifically developed to be used in the Australian and New Zealand construction industry for 125-200mm thick precast panels. The unique I-shaped anchor combines maximum capacity and stiffness with a slim anchor design for thin, heavily reinforced panels.

Ultra slim, HI working load
• 7T WLL, 40mm wide anchor, 50mm recess
• For all panels from 100mm thickness

New I-beam head
• Restricts clutch rotation
• Lowers the risk of concrete cracking and spalling

Plain & ‘Step-Joint’ Panels
• Perfect solution for step-joint, ‘weather seal’ panels
• Slim shape for maximum edge distances
• EdjPro clutch clears the concrete when edge lifting
• Stronger performance: factory, transportation and erection

Safe
• 7T WLL when used with a 20mm tension bar
• Conforms to WorkSafe NZ Good Practice Guidelines for Safe Work with Precast Concrete (Oct 2018)

Latest News

Holiday Closing 2026

Our offices will close from Thursday, 25th December 2025 and re-open at our usual business hours on Monday, 5th January 2026.

Ancon 500 Tension System renamed to Halfen Detan-D

As a future-oriented, innovative company, Leviat focuses on the ever-changing requirements of the industry, and our latest development combines the portfolio of Ancon and Halfen Tension Systems to ensure we meet the individual requirements of our customers.